Overcoming Challenges at Portland Place

Smart Solutions for a Complex Urban Lift

Nestled in the heart of London, our project at Portland Place presented a unique set of challenges. With strict scheduling requirements and structural limitations to consider, we had to develop innovative solutions to keep the operation running smoothly and on time.

Avoiding Road Closures: Thinking Outside the Box

A key requirement for this project was to avoid an extensive road closure process, which could have significantly impacted the timeline. Our solution? Positioning the crane’s outriggers on the pavement instead. However, this approach introduced a new challenge—vaults beneath the pavement posed a structural risk.

Innovative Load Management: Reinforcing Stability

To ensure stability and protect the underground vaults, we implemented a multi-layered support system. Acro props were strategically placed to reinforce the vaults, preventing any risk of collapse. Above ground, we laid etha-foam and timber mats beneath the crane’s outriggers, carefully distributing the load to maintain both safety and efficiency. This approach enabled us to operate within the confined urban environment while mitigating structural risks.

Council Approval and Logistical Planning

Navigating regulatory requirements is a crucial aspect of any urban lifting project. By working closely with the local council, we secured approval for a partial road closure by suspending adjacent parking bays. This allowed us to deploy the AK46 Bocker crane using its advanced short-rigging capabilities—minimising disruption while maintaining lifting capacity.

To streamline operations, we coordinated all logistics in advance. Rather than relying on third-party deliveries, we arranged for the client to send all necessary equipment directly to our storage facility. Our team then transported everything to the site on the day of the lift, eliminating any potential delays and ensuring a seamless workflow.

Precision Execution: Safe and Efficient Lifting

The lift itself involved positioning five air conditioning units onto the roof of the building. Safety was paramount, and our pedestrian marshals ensured public safety by managing foot traffic throughout the operation. Every stage of the process was executed with precision, ensuring a swift and smooth lift with minimal disruption to the local area.

A Successful Outcome: Problem-Solving in Action

Through creative problem-solving, meticulous planning, and flawless execution, we overcame the logistical and structural challenges of the Portland Place project. By thinking ahead, collaborating closely with regulatory bodies, and leveraging innovative lifting techniques, we delivered a successful outcome that met the client’s expectations while adhering to the highest safety and efficiency standards.

This project is yet another testament to our ability to navigate complex urban lifting operations, providing smart, safe, and effective solutions in the most challenging environments.