Contract Lifting Case Studies
 |
|
Royal Bank of Scotland - Full contract lift of 69 Metres, lifting of a 3 Ton chiller unit.
An interesting project, due to the ongoing problems in Bishopsgate, we relocated the crane to Spital Square saving our clients over £4000 in road closure and traffic management fees by assessing the project from a totally different point of view from our competitors. We provided all documentation, Method Statements, Insurace and Labour in order to complete the project.
|
 |
|
D.T.I. -
Liting a new window cleaning cradle weighing 2.5t into place for Tractel
A major supplier of window cleaning equipment to government and buildings.
A full contract lift at the D.T.I building for Tractel, our method statements and risk assessment was passed without fault. We provided all local permits, road closure and restriction of parking bays to provide a smooth trouble free operation.
|
 |
|
British Telecom Project -
A Full Contract Lift of a section of architectural feature
Comprising of twelve sections the assembly was lifted onto the side of the building and set in place whilst engineers fixed the feature together.
All method statements, risk assessments and local permits were obtained by us and we suppied all labour to complete the project on schedule.
|
 |
|
Shelley House - A Full Contract Lift in the city of London for Skanska Rashleigh Weatherfoil Ltd
Including full road closure, all traffic management, supply of all cranage and labour, permits and full insurance.
A 47 Metre high lift to remove 2 chiller units and install 2 replacement chiller units, 8500 Kg each unit. |
|
|
|